Setting up a manufacturing business in the UAE
A UAE factory needs a local industrial licence, then MoIAT's production licence for customs exemptions, and must update the Industrial Registry every year.

Answer in brief
A factory needs an industrial licence from its emirate or free zone, then MoIAT's production licence. It lets you claim customs duty exemption on machinery and raw materials (AED 100 per HS code). MoIAT's FAQ asks for at least 10 employees and AED 250,000 capital. Manufacturers update the Industrial Registry yearly. MoIAT licence page re-read 12 November 2026; rest 26 October.
- The customs duty exemption on industrial inputs is closed to you until MoIAT issues the production licence
- The Industrial Registry covers factories in free zones and specialised zones too, and must be updated every year with a full financial year of data
- Some unexpected manufacturing lines, such as toughened and laminated flat glass and radar equipment, sit on Dubai's defence list and need a local partner on the Dubai mainland
On this page (18)
What an industrial licence is in the UAE, and MoIAT's federal layer
Your emirate or free zone issues the industrial licence that creates the factory. The Ministry of Industry and Advanced Technology (MoIAT) then adds a federal layer, the industrial production licence. That licence lets you apply for customs duty exemption. The exemption covers machinery, equipment, spare parts and materials used directly in production (MoIAT, Issue Industrial Production License).
In Dubai, the Department of Economy and Tourism (DET) treats the national industrial licence as an external approval. Its list names two approving bodies: MoIAT, and the Ministry of Economy under its older name (Invest in Dubai, Additional approvals). The difference between an industrial, a commercial and a professional licence is covered on activities and licences.
Industrial licence requirements: the licences and certificates a factory needs
| Step | Who issues it | What it gives you | Conditions | Fee |
|---|---|---|---|---|
| Local industrial licence | Your emirate's licensing authority or your free zone | The legal right to set up the factory | Set by that authority | Not verified, ask the licensing authority |
| Industrial production licence | MoIAT | Access to customs duty exemption on industrial inputs | Local industrial licence; MoIAT's FAQ adds 10 employees and AED 250,000 capital | AED 100 inspection; AED 0 application |
| Industrial Registry | MoIAT | The factory's record with the ministry | Annual update with a full financial year of data | Free |
| Customs duty exemption on inputs | MoIAT approval, checked by a customs officer | Duty exemption on registered machinery, equipment or raw materials | Production licence, or an initial approval certificate for machines | AED 100 per HS code |
| Certificate of conformity | MoIAT | Permission to sell products covered by a UAE technical regulation | Product must meet the regulation | AED 500 to issue, plus AED 620 review and AED 600 registration (below) |
| In-Country Value (ICV) certificate | MoIAT, through an audit firm you select | A certified ICV score for your firm | Valid business licence and audited financial statements | AED 500 to AED 10,000, paid to the audit firm |
Sources: MoIAT service pages for the production licence, Industrial Registry, customs exemption, conformity certificates and ICV certification, all read 26 October 2026.
Industrial production licence: the 10-employee and AED 250,000 conditions
MoIAT's FAQ on the production licence lists four criteria:
- a memorandum of association (one-person companies count, personal companies do not)
- at least 10 employees
- total capital of at least AED 250,000
- an industrial licence from a local licensing department
The same employee and capital lines appear in the FAQ of MoIAT's ICV service (MoIAT, Issuing an ICV certification).
These conditions come from MoIAT's published FAQ on its production licence service page, which we re-read on 12 November 2026 together with the AED 100 inspection fee and AED 0 application fee. We could not read the law behind them.
That law is Federal Decree-Law No. 25 of 2022, with its Executive Regulation 79 of 2023. So we do not present them as statute. Suppose your plant starts with fewer than 10 staff or less than AED 250,000 of capital. Then ask MoIAT in writing whether it will issue the licence.
MoIAT asks for these documents:
- the local industrial licence
- the partnership and incorporation contracts
- the owner's or manager's ID
The page gives two processing times. The service card says 5 working days. Its FAQ says "within 15 business days". Plan on the longer one.
Industrial Registry: a yearly update, free zones included
MoIAT's registry covers all industrial facilities and facilities that carry out manufacturing, "including those in free economic zones and specialised zones". It covers them whatever their licence type, with one record per licence.
Source: MoIAT, Industrial Registry. The page is in Arabic. The translation is ours.
You update the record every year with data for a full financial year:
- production inputs and manufactured products
- energy consumption
- financial data
The legal basis MoIAT gives is Federal Decree-Law No. 25 of 2022 and its Executive Regulation 79/2023. The service is free. An initial approval is renewed annually on MoIAT's e-services platform (MoIAT, Issue Industrial Registry).
MoIAT's pages state no filing deadline or penalty. We did not read the decree-law, so ask MoIAT when your first update is due.
A free zone factory still files. Zone options for industry are on JAFZA, RAKEZ and Abu Dhabi free zones.
Customs duty exemption on machinery and raw materials
MoIAT approves exemption for machinery, equipment or raw materials you have first registered with the ministry. Its FAQ says the exemption is not available without a production licence. The service also accepts an initial approval certificate for machines. The fee is AED 100 for each HS code (the customs tariff code for the item). The service is instant. A customs officer then checks the application (MoIAT, Request Customs Duty Exemption for Industrial Inputs).
For most goods the duty saved is up to 5% of the CIF value (cost, insurance and freight). The government portal puts UAE tariffs at 0 to 5%. It puts Dubai's at 5% of CIF (u.ae, Customs duty and tariff, updated 14 September 2026).
Each item's rate follows its HS code. Ask your emirate's customs authority. The import side of the business, including the customs code, is on trading, import and export.
Can a foreigner own a factory? Yes, except on a defence list
Security, defence and military activities are one of the seven strategic-impact activities under Cabinet Resolution No. 55 of 2021. A regulator sets the ownership terms for them (MoET, Promising sectors). DET's foreign ownership restrictions list spells out what that means for factories. Under security and defence it names manufacturing lines a founder might not expect (Invest in Dubai, Foreign ownership restrictions list, read 26 October 2026):
- Toughened and laminated flat glass manufacturing
- Radar equipment manufacturing
- Sensors and military communication systems manufacturing
- Military garments manufacturing
- Explosives and pyrotechnic products manufacturing
- Propellant powders manufacturing
- Military aircraft manufacturing
For these, DET says you will need to work with a local partner on the Dubai mainland. Some provider pages still say every mainland factory needs a 51% UAE partner. The official lists do not say that. The general rules are on external approvals and restricted activities.
Selling regulated products: the conformity certificate
Some products fall under a UAE technical regulation. If yours does, MoIAT must issue a certificate of conformity before you sell it. The listed fees are:
- AED 600 for the product registration request
- AED 620 for document review per certificate
- AED 500 to issue the certificate
A technical evaluation, if one is carried out, costs AED 2,500 per assessor per day. MoIAT states one and a half working days (MoIAT, Issue conformity certificates for regulated products).
ICV certificate for manufacturers: audit fee and timing
MoIAT's National In-Country Value (ICV) certificate needs a valid business licence and audited financial statements. It is valid for one year and takes 14 to 28 working days. You choose an audit firm, which carries out a field audit. Its fee "can range from AED 500 to AED 10,000" (MoIAT, Issuing an ICV certification). How public buyers use it is on selling to UAE buyers.
Corporate tax: manufacturing and processing as free zone Qualifying Activities
Manufacturing and processing are both Qualifying Activities for a Qualifying Free Zone Person under Article 2(1) of Ministerial Decision No. 229 of 2025. It replaced Ministerial Decision No. 265 of 2023 with effect from 1 June 2023. Many pages still cite the 2023 decision.
The definitions matter for a factory. Under Article 2(3), manufacturing includes "the production, improvement or assembly of products and materials from raw materials or components". Processing includes the preparation, treatment, transformation or conversion of goods into another form for commercial or industrial use or sale. So assembly qualifies. Repacking is not named; ask the Federal Tax Authority (FTA) if your process is mainly repacking.
Sales of your own products to mainland or foreign businesses can be Qualifying Income. Cabinet Decision No. 100 of 2023 counts income from a Non-Free Zone Person for a Qualifying Activity that is not an Excluded Activity.
Source: Cabinet Decision No. 100 of 2023, Article 3(1)(b).
Sales to individuals, from a factory shop or a website, are not qualifying. Any transaction with natural persons is an Excluded Activity. Manufacturing is not among its exceptions (MD 229 of 2025, Article 2(2)(a)). That non-qualifying revenue is tolerated up to 5% of total revenue or AED 5,000,000, whichever is lower. Status is lost from the start of that tax period and for the next four (MD 229 of 2025, Articles 3 and 5(2)).
Qualifying status also needs audited financial statements (Article 5(1)(b)). Failing that has the same result. Those conditions are explained on qualifying free zone person.
Building materials for Dubai sites need Dubai Municipality registration
Dubai Municipality limits building materials suppliers and manufacturers to firms licensed by DET and registered with its Registration and Licensing Committee.
Source: Dubai Municipality, Consultants, Contractors and Suppliers Data.
A block, precast or steel plant that supplies Dubai projects needs that registration on top of MoIAT. The contractor side is on construction and contracting.
A worked example: an inverter assembly plant in a Dubai free zone
Assumptions are ours. A foreign-owned company assembles solar inverters in a Dubai free zone. It has 14 staff and AED 300,000 capital. It imports six component types with six HS codes. One product falls under a technical regulation. There are no assessor days.
The plant meets MoIAT's FAQ conditions (14 is at least 10; AED 300,000 is at least AED 250,000). Assembly is manufacturing under the tax definition. The federal fees we could source add up as follows:
| MoIAT fee | Arithmetic | Amount |
|---|---|---|
| Production licence inspection | AED 100 | |
| Customs exemption, six HS codes | 6 × 100 | AED 600 |
| Conformity: product registration | AED 600 | |
| Conformity: document review | AED 620 | |
| Conformity: certificate issue | AED 500 | |
| Industrial Registry | AED 0 | |
| Total federal fees in year one | 100 + 600 + 600 + 620 + 500 | AED 2,420 |
The total excludes:
- the free zone's own licence and lease
- staff visas
- any ICV audit (AED 500 to AED 10,000 if the plant bids for public work)
- the duty itself on any item not exempted
Manufacturing mistakes: machinery before the licence, products before the certificate
- Shipping machinery before the production licence. The exemption needs the licence or an initial approval certificate for machines, and the items must be registered with MoIAT first.
- Launching a regulated product, or supplying Dubai building sites, without the certificate or DM registration.
We did not research environmental or Civil Defence approvals for factories. Ask your municipality and the Civil Defence authority what they need before you fit out.
Related business types: construction and contracting covers building materials suppliers, logistics and transport covers warehousing and freight, trading and import-export covers the customs side, and the business types hub lists the rest. Port-side zone options are on JAFZA.
Key facts
| Fact | Value | Applies to | Effective from | Source | Checked |
|---|---|---|---|---|---|
| Production licence conditions | 10 employees; AED 250,000 capital; local industrial licence (MoIAT FAQ) | Facilities subject to industrial licensing | Not stated | MoIAT, production licence | 26 October 2026 |
| Production licence fees | AED 100 inspection; AED 0 application | Facilities subject to industrial licensing | Not stated | MoIAT, production licence | 26 October 2026 |
| Production licence processing time | 5 working days (service card); within 15 business days (FAQ) | Facilities subject to industrial licensing | Not stated | MoIAT, production licence | 26 October 2026 |
| Industrial Registry | Annual update; free; includes free and specialised zones | All industrial and manufacturing facilities | Federal Decree-Law No. 25 of 2022 | MoIAT, Industrial Registry | 26 October 2026 |
| Customs duty exemption on inputs | AED 100 per HS code; production licence required | Licensed manufacturers | Not stated | MoIAT, exemption service | 26 October 2026 |
| Conformity certificate | AED 500 issue; AED 620 document review; AED 600 product registration; AED 2,500 per assessor day | Products under UAE technical regulations | Not stated | MoIAT, conformity | 26 October 2026 |
| ICV certificate | Audit fee AED 500 to AED 10,000; valid 1 year; 14 to 28 working days | Suppliers seeking ICV certification | Not stated | MoIAT, ICV | 26 October 2026 |
| QFZP Qualifying Activities | Manufacturing and processing of goods or materials, among others | Qualifying Free Zone Person | 1 June 2023 | Ministerial Decision No. 229 of 2025 | 24 October 2026 |
| Loss of QFZP status | Failing tax period plus the next 4 tax periods | Qualifying Free Zone Person | 1 June 2023 | Ministerial Decision No. 229 of 2025, Article 5(2) | 24 October 2026 |
| De minimis limit on non-qualifying revenue | 5% of total revenue or AED 5,000,000, whichever is lower; sales to individuals count as non-qualifying | Qualifying Free Zone Person | 1 June 2023 | MD 229 of 2025, Articles 2(2)(a) and 3 | 26 October 2026 |
| Restricted manufacturing lines | Defence-linked lines including flat glass and radar equipment need a local partner | Dubai mainland | Not stated | Invest in Dubai, restrictions list | 26 October 2026 |
| Local industrial licence fee | Not verified, ask the licensing authority | DET, ADDED, free zones | Not stated | Not read | 26 October 2026 |
| General customs duty rate | 0 to 5%; Dubai 5% of CIF value (alcohol 50%, cigarettes 100%); item rate by HS code | Goods imported into the UAE | Not stated | u.ae, Customs duty and tariff | 26 October 2026 |
Sources checked
- Issue Industrial Production License, Ministry of Industry and Advanced Technology: accessed 26 October 2026
- Renew Industrial Production License, Ministry of Industry and Advanced Technology: accessed 26 October 2026
- Industrial Registry (Arabic), Ministry of Industry and Advanced Technology: accessed 26 October 2026
- Issue Industrial Registry, Ministry of Industry and Advanced Technology: accessed 26 October 2026
- Request Customs Duty Exemption for Industrial Inputs, Ministry of Industry and Advanced Technology: accessed 26 October 2026
- Issuing an ICV certification, Ministry of Industry and Advanced Technology: accessed 26 October 2026
- Issue conformity certificates for regulated products, Ministry of Industry and Advanced Technology: accessed 26 October 2026
- Ministerial Decision No. 229 of 2025 Regarding Qualifying Activities and Excluded Activities, Ministry of Finance: accessed 26 October 2026
- Cabinet Decision No. 100 of 2023 on Determining Qualifying Income for the Qualifying Free Zone Person, Federal Tax Authority: accessed 26 October 2026
- Additional approvals list, Invest in Dubai (Department of Economy and Tourism): accessed 26 October 2026
- Foreign ownership restrictions list, Invest in Dubai (Department of Economy and Tourism): accessed 26 October 2026
- Promising sectors, Strategic Impact Activities, Ministry of Economy and Tourism: accessed 24 October 2026
- Customs duty and tariff, u.ae (UAE government portal): accessed 26 October 2026 (page updated 14 September 2026)
- Consultants, Contractors and Suppliers Data, Dubai Municipality: accessed 26 October 2026
Frequently asked questions
Yes, through customs and permits rather than MoIAT, whose registry and production licence apply either way. The customs side is on trading, import and export, and Dubai's permit for free zone companies on the mainland is on the Dubai free zone mainland permit.
We could not find a current published fee for the local industrial licence. We checked DET, the Abu Dhabi Department of Economic Development (ADDED) and the free zones. Dubai's published fee schedule, Executive Council Resolution No. 13 of 2011, has no industrial-specific line. Ask the licensing authority for a written fee calculation. The federal fees MoIAT publishes are in the table above.
You renew the local industrial licence with the authority that issued it (DET, ADDED or your free zone), on a fee and timetable we did not verify. Federally, MoIAT's Industrial Registry record is updated every year with a full financial year of data, free of charge. MoIAT's production licence page, read 26 October 2026, states no validity period. Its separate renewal service charges AED 500 to apply and AED 100 for an inspection if one is needed. It states 3 working days. It fines late renewal AED 100 a month up to AED 1,000 (MoIAT, Renew Industrial Production License). Ask MoIAT when yours lapses.
Related reading
- Decision guideChoosing your licensed activity, and how many one licence can holdHow your activity sets the UAE licence type, how many activities one licence holds in RAKEZ, DMCC, JAFZA and Meydan, and what extra activities cost.
- Tax guideQualifying Free Zone Person: conditions, activity lists and qualifying incomeEach QFZP condition with its instrument, both activity lists, the de minimis test worked through, the audit rule and the FTA Decision No. 6 of 2026 report.
- Business type guideSetting up a trading, import or export company in the UAESet up a UAE trading company: general vs specialised trading, the Dubai Customs code (AED 100 + 20), 5% duty, free zone re-export rules and agency limits.
